Bridge deck drainage device for bridge and implementation method thereof
1. The utility model provides a bridge floor drainage device for bridge which characterized in that: the bridge comprises a bridge component (1), wherein a supporting component (2) is arranged above the bridge component (1), two ends of two side faces of the supporting component (2) are respectively provided with a cable lifting rod (3), a fixing part (4) is installed below the cable lifting rod (3), a drainage component (5) is arranged on a bridge deck of the bridge component (1), a cleaning component (6) is arranged inside the drainage deck of the drainage component (5), the cleaning component (6) is arranged inside the bridge deck of the bridge component (1), and an in-line component (7) is arranged in the top end of the supporting component (2).
2. A bridge deck drainage device according to claim 1, wherein: the bridge assembly (1) comprises transverse bridge panels (11), fixed side connection plates (12), main supporting railings (13), auxiliary supporting railings (14) and an upper connection plate (15), the two sides of each transverse bridge panel (11) are respectively connected with the fixed side connection plates (12), multiple groups of main supporting railings (13) are fixed on the upper end faces of the fixed side connection plates (12), multiple groups of auxiliary supporting railings (14) are fixed on the upper end faces of the fixed side connection plates (12) between every two adjacent main supporting railings (13), and the upper end faces of the main supporting railings (13) and the auxiliary supporting railings (14) are connected with the upper connection plate (15).
3. A bridge deck drainage device according to claim 2, wherein: support assembly (2) include main tributary stake (21), support frame seat (22), cup joint hole (23) and cup joint dead lever (24), main tributary stake (21) set up two sets ofly, fix respectively on bridge subassembly (1), and main tributary stake (21) bottom pierces through bridge subassembly (1) and pours with the pier and be connected, the top transverse connection of two sets of main tributary stakes (21) has support frame seat (22), set up in the both sides of support frame seat (22) and be used for cable rod (3) to pierce through fixed cup joint hole (23), cup joint dead lever (24) upper end fixed cup joint on cable rod (3), the below fixed mounting who cup joints dead lever (24) is on fishplate (15).
4. A bridge deck drainage device according to claim 3, wherein: mounting (4) are including last joint ring (41), lower joint ring (42), joint groove (43) and connection weld plate (44), go up joint ring (41) and lower joint ring (42) the inner all set up corresponding joint groove (43), go up joint ring (41) and lower both ends of joint ring (42) welded connection weld plate (44) respectively, lower joint ring (42) are fixed on the top of cup jointing dead lever (24), go up joint ring (41) and connect weld plate (44) to install by bolt fastening through both ends connection between lower joint ring (42), hang cable pole (3) cladding setting is in last joint ring (41) and joint groove (43) between lower joint ring (42).
5. A bridge deck drainage device according to claim 4, wherein: drainage subassembly (5) are including water drainage tank (51), left side put groove (52), right side put groove (53) and delivery port (54), water drainage tank (51) are transversely seted up in horizontal bridge panel (11), left side is seted up on the inside left side of water drainage tank (51) and is put groove (52), delivery port (54) are connected at the both ends that right side was seted up on the inside right side of water drainage tank (51) and is put groove (53) water drainage tank (51), delivery port (54) set up in fixed side connection board (12), drainage subassembly (5) set up the multiunit, all set up side by side in horizontal bridge panel (11).
6. A bridge deck drainage device according to claim 5, wherein: clearance subassembly (6) are including lead screw (61), orientation pole (62), gear shaft (63), the slip collar (64), connecting plate (65), clearance brush (66) and power component (67), lead screw (61) set up and put groove (52) on the left side, orientation pole (62) set up and put groove (53) on the right side, the meshing has cup jointed gear shaft (63) on lead screw (61), slip collar (64) are cup jointed in the activity on orientation pole (62), connect by connecting plate (65) between gear shaft (63) and slip collar (64), clearance brush (66) are installed to the below of connecting plate (65), clearance brush (66) are connected with the laminating of water drainage tank (51) bottom.
7. A bridge deck drainage device according to claim 6, wherein: power component (67) are connected with a set of lead screw (61) one end including clearance motor (671), linkage chain belt (672) and cup joint gear (673), clearance motor (671), lead screw (61) set up the multiunit, and gear (673) are cup jointed in the equal installation of one section of multiunit lead screw (61), cup joint by linkage chain belt (672) between cup joint gear (673) on lead screw (61).
8. A bridge deck drainage device according to claim 7, wherein: the in-line assembly (7) comprises an inner drainage groove (71), inclined through holes (72) and an inner vertical drainage groove (73), wherein the inner drainage groove (71) is formed in the upper end of the transverse bridge panel (11), a plurality of groups of inclined through holes (72) are formed in the two sides of the inner drainage groove (71) respectively, and the inner vertical drainage groove (73) is formed below the two ends of the inner drainage groove (71).
9. A bridge deck drainage device according to claim 8, wherein: the inside of bridge subassembly (1) sets up installation reinforcement subassembly (8), installation reinforcement subassembly (8) are including handing-over inside groove (81), crisscross tooth (82), interior glue film (83) and reinforcement steel sheet (84), handing-over inside groove (81) are seted up at horizontal bridge panel (11) side, handing-over inside groove (81) are provided with a plurality ofly, the quantity that crisscross tooth (82) set up is the same with handing-over inside groove (81), crisscross tooth (82) are fixed at adjacent horizontal bridge panel (11) side, crisscross tooth (82) and handing-over inside groove (81) meshing, the below of two adjacent horizontal bridge panels (11) is fixed by reinforcement steel sheet (84).
10. A method for implementing the bridge deck drainage device according to claim 9, wherein: the method comprises the following steps:
the method comprises the following steps: the main support pile (21) supports the sling rod (3) and the bridge component (1), and the sling rod (3) is fixedly sleeved on sleeved fixing rods (24) at two sides of the main support pile (21) through fixing pieces (4) for fixing;
step two: the drainage channel (51) is used for draining water on the bridge floor, so that rainwater can be collected and drained, and the drainage efficiency of the whole bridge floor is improved;
step three: clearance motor (671) drive through linkage chain belt (672) and cup joint multiunit lead screw (61) rotation in gear (673) to drive gear shaft (63) on lead screw (61) and remove, when gear shaft (63) removed, slip lantern ring (64) and connecting plate (65) removed together, connecting plate (65) when removing, drive clearance brush (66) and clear up in to water drainage tank (51), prevent that water drainage tank (51) from blockking up.
Background
When the bridge carries out the use, the bridge floor has the rainwater when raining, and the rainwater of bridge floor just need use the drain pipe to discharge the rainwater to the bridge floor does not produce ponding, makes things convenient for the vehicle to travel. When the installation that has now, need use the screw fixation on the pier with the drainage, when the screw fixation, installer will be alone the drain pipe, another personal use tool with the screw fixation, need two people's cooperations simultaneously, complex operation like this, inconvenient installation wastes time and energy, has reduced the problem of installation effectiveness.
Disclosure of Invention
The invention aims to provide a bridge deck drainage device for a bridge and an implementation method thereof, wherein the bridge deck drainage device ensures the overall stability, avoids large amplitude shaking, improves the drainage efficiency of the whole bridge deck, prevents rainwater from pressurizing the bridge deck, reduces the burden of the bridge, prolongs the service life of the bridge, prevents a drainage channel from being blocked, improves the cleaning efficiency in the drainage channel, ensures the internal cleanness, prevents sundries from being blocked to cause incapability of drainage, improves the stability of the whole bridge body, increases the safety of the whole bridge body, ensures the safety of personnel, increases the use stability, and ensures the reinforcement of a joint through reinforcement of a reinforced steel plate, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a bridge floor drainage device for bridge, includes the bridge subassembly, the top of bridge subassembly sets up supporting component, and the both ends of supporting component both sides face set up the suspension cable pole respectively, and the below installation mounting of suspension cable pole sets up drainage subassembly on the bridge floor of bridge subassembly, drainage subassembly's inside is provided with the clearance subassembly, the clearance subassembly sets up inside the bridge floor of bridge subassembly, sets up in the top of supporting component and arranges the subassembly in order.
Further, the bridge assembly comprises a transverse bridge panel, a fixed side connection plate, main supporting railings, auxiliary supporting railings and an upper connection plate, the two sides of the transverse bridge panel are respectively connected with the fixed side connection plate, multiple groups of main supporting railings are fixed on the upper end face of the fixed side connection plate, multiple groups of auxiliary supporting railings are fixed on the upper end face of the fixed side connection plate between every two adjacent main supporting railings, and the upper end faces of the main supporting railings and the auxiliary supporting railings are connected with the upper connection plate.
Further, the supporting component includes the main tributary stake, the carriage seat, cup joint the hole and cup joint the dead lever, the main tributary stake sets up two sets ofly, fix respectively on the bridge subassembly, and main tributary stake bottom pierces through the bridge subassembly and pour with the pier and be connected, the top transverse connection of two sets of main tributary stakes has the carriage seat, set up in the both sides of carriage seat and be used for the hoist cable pole to pierce through fixed hole of cup jointing, cup joint the fixed cup joint on the dead lever on the hoist cable pole, the below fixed mounting who cup joints the dead lever is on the fishplate bar.
Further, the mounting includes connects the ring, connects ring, joint groove and connection to weld the board down, goes up to connect the ring and all sets up corresponding joint groove with the inner that connects the ring down, goes up to connect the ring and welds the board with the both ends difference welded connection that connects the ring down, connects the ring to fix on the top of cup jointing the dead lever down, goes up to connect to weld the board through both ends between the ring and connect down and install by bolt fastening, and the hoist cable pole cladding sets up at last connect the ring and connect the joint inslot between the ring down.
Further, the drainage assembly comprises a drainage groove, a left groove, a right groove and a water outlet, the drainage groove is transversely formed in the transverse bridge panel, the left groove is formed in the left side of the inside of the drainage groove, the two ends of the right groove are formed in the right side of the inside of the drainage groove, the water outlet is connected with the two ends of the right groove, the water outlet is formed in the fixed side connection plate, and the drainage assembly is provided with a plurality of groups and is arranged in the transverse bridge panel side by side.
Further, the clearance subassembly includes lead screw, orientation pole, gear shaft, the slip lantern ring, connecting plate, clearance brush and power component, and the lead screw setting is put the inslot at the left side, and the orientation pole setting is put the groove at the right side, and the meshing has cup jointed the gear shaft on the lead screw, and the slip lantern ring is cup jointed in the activity on the orientation pole, is connected by the connecting plate between gear shaft and the slip lantern ring, and the clearance brush is installed to the below of connecting plate, and the clearance brush is connected with the laminating of water drainage tank bottom.
Further, the power assembly comprises a cleaning motor, a linkage chain belt and a sleeve gear, the cleaning motor is connected with one end of a group of screw rods, the screw rods are provided with a plurality of groups, the sleeve gear is installed on one section of each group of screw rods, and the sleeve gears on the screw rods are sleeved by the linkage chain belt.
Further, the in-line assembly comprises an inner drainage groove, inclined through holes and an inner vertical drainage groove, the inner drainage groove is formed in the upper end of the transverse bridge panel, multiple groups of inclined through holes are formed in the two sides of the inner drainage groove respectively, and the inner vertical drainage grooves are formed below the two ends of the inner drainage groove.
Further, the inside of bridge subassembly sets up the installation and consolidates the subassembly, and the installation is consolidated the subassembly and is included handing-over inside groove, staggered teeth, interior glue film and reinforcement steel sheet, and the handing-over inside groove is seted up at horizontal bridge panel side, and the handing-over inside groove is provided with a plurality ofly, and the quantity that staggered teeth set up is the same with the handing-over inside groove, and staggered teeth fixes at adjacent horizontal bridge panel side, and staggered teeth and handing-over inside groove meshing, the below of two adjacent horizontal bridge panels is fixed by the reinforcement steel sheet.
The invention provides another technical scheme: an implementation method of a bridge deck drainage device for a bridge comprises the following steps:
the method comprises the following steps: the main supporting pile supports the sling rod and the bridge component, and the sling rod is fixedly sleeved on the sleeved fixing rods at the two sides of the main supporting pile through the fixing piece for fixing;
step two: the drainage grooves are used for draining water on the bridge floor, so that rainwater can be collected and drained, and the drainage efficiency of the whole bridge floor is improved;
step three: the clearance motor drives through the linkage chain belt and cup joints the multiunit lead screw rotation in the gear to drive the gear shaft removal on the lead screw, when the gear shaft removed, the slip lantern ring removed together with the connecting plate, and the connecting plate drives the clearance brush and clears up in to the water drainage tank when removing, prevents that water drainage tank from blockking up.
Compared with the prior art, the invention has the beneficial effects that:
1. the invention provides a bridge deck drainage device for a bridge and an implementation method thereof.A support frame seat is transversely connected to the top ends of two groups of main support piles, sleeve holes for penetrating and fixing a sling rod are formed in two sides of the support frame seat, the upper end of a sleeve fixing rod is fixedly sleeved on the sling rod, the lower part of the sleeve fixing rod is fixedly arranged on an upper connecting plate, a support assembly effectively supports the sling rod, the whole bridge body is pulled to support, the integral stability is ensured, and the phenomenon of large-amplitude shaking is avoided;
2. according to the bridge deck drainage device for the bridge and the implementation method thereof, the water outlets are arranged in the fixed side joint plates, the drainage assemblies are provided with a plurality of groups and are arranged in the transverse bridge panels side by side, and the drainage grooves are arranged for draining water on the bridge deck, so that rainwater can be collected and drained, the drainage efficiency of the whole bridge deck is improved, the bridge deck is prevented from being pressurized by rainwater, the load of the bridge is reduced, and the service life of the bridge is prolonged;
3. the bridge floor drainage device for the bridge and the implementation method thereof provided by the invention have the advantages that a cleaning motor is connected with one end of a group of screw rods, the screw rods are provided with a plurality of groups, one section of each group of screw rods is provided with a sleeved gear, the sleeved gears on the screw rods are sleeved by a linkage chain belt, the cleaning motor drives the screw rods in the sleeved gears to rotate through the linkage chain belt, so that a gear shaft on the screw rods is driven to move, a sliding lantern ring and a connecting plate move together when the gear shaft moves, and when the connecting plate moves, a cleaning brush is driven to clean the drainage channel, so that the drainage channel is prevented from being blocked, the cleaning efficiency in the drainage channel is improved, the internal cleanness is ensured, and the phenomenon that drainage cannot be performed due to blockage of sundries is prevented;
4. according to the bridge deck drainage device for the bridge and the implementation method thereof, the upper end surfaces of the fixed side connecting plates between two adjacent main supporting railings are fixedly provided with the multiple groups of auxiliary supporting railings, the upper end surfaces of the main supporting railings and the auxiliary supporting railings are connected with the upper connecting plates, and the main supporting railings, the auxiliary supporting railings and the upper connecting plates are arranged to protect two sides of the bridge deck, so that the stability of the whole bridge body is improved, the safety of the whole bridge body is improved, and the safety of personnel is ensured;
5. the bridge deck drainage device for the bridge and the implementation method thereof provided by the invention have the advantages that the number of the cross-over inner grooves is the same as that of the cross-over inner grooves, the cross-over teeth are fixed at the side ends of the adjacent transverse bridge panels and meshed with the cross-over inner grooves, the lower parts of the two adjacent transverse bridge panels are fixed by the reinforcing steel plates, and the cross-over mounting structure prevents the transverse bridge panels from being staggered, reduces the moving space, ensures the tightness after mounting, increases the friction of the inner rubber layer, improves the tightness and the reinforcing effect after mounting, increases the use stability, and ensures the reinforcement of the connecting parts through the reinforcement of the reinforcing steel plates.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a partial structure of a bridge module according to the present invention;
FIG. 3 is a partial structural view of the support assembly of the present invention;
FIG. 4 is a schematic view of the fastener of the present invention;
FIG. 5 is a schematic view of the overall structure of the drainage assembly of the present invention;
FIG. 6 is an enlarged view taken at A of FIG. 5 in accordance with the present invention;
FIG. 7 is a schematic view of a cleaning assembly according to the present invention;
FIG. 8 is a schematic view of a partial configuration of the power assembly of the present invention;
FIG. 9 is a schematic view of an in-line assembly of the present invention;
FIG. 10 is a schematic partial structure diagram according to a second embodiment of the present invention;
fig. 11 is a mounting reinforcement assembly of the present invention.
In the figure: 1. a bridge component; 11. a transverse bridge deck; 12. fixing the side connection plate; 13. a main support rail; 14. a secondary support rail; 15. an upper connecting plate; 2. a support assembly; 21. a main support pile; 22. a support frame seat; 23. sleeving a hole; 24. sleeving a fixed rod; 3. a hoist cable rod; 4. a fixing member; 41. an upper connecting ring; 42. a lower connecting ring; 43. a clamping groove; 44. connecting the welding plates; 5. a drainage assembly; 51. a water discharge tank; 52. a left groove is arranged; 53. a right slot is arranged; 54. a water outlet; 6. cleaning the assembly; 61. a screw rod; 62. an orientation bar; 63. a gear shaft; 64. a slip collar; 65. a connecting plate; 66. cleaning the brush; 67. a power assembly; 671. cleaning the motor; 672. linking the chain belts; 673. sleeving a gear; 7. arranging components in sequence; 71. an inner drainage tank; 72. an oblique through opening; 73. a vertical drainage inner tank; 8. installing a reinforcing component; 81. handing over the inner grooves; 82. staggered teeth; 83. an inner glue layer; 84. and (5) reinforcing the steel plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1, a bridge deck drainage device for a bridge and an implementation method thereof include a bridge assembly 1, a support assembly 2 is arranged above the bridge assembly 1, two ends of two side surfaces of the support assembly 2 are respectively provided with a suspension cable rod 3, a fixing member 4 is arranged below the suspension cable rod 3, a drainage assembly 5 is arranged on a bridge deck of the bridge assembly 1, a cleaning assembly 6 is arranged inside the drainage assembly 5, the cleaning assembly 6 is arranged inside the bridge deck of the bridge assembly 1, and a parallel drainage assembly 7 is arranged at the top end of the support assembly 2.
Referring to fig. 2, the bridge module 1 includes a transverse bridge deck 11, fixed side connection plates 12, main support rails 13, auxiliary support rails 14 and an upper connection plate 15, the two sides of the transverse bridge deck 11 are respectively connected to the fixed side connection plates 12, a plurality of sets of main support rails 13 are fixed on the upper end surface of the fixed side connection plates 12, a plurality of sets of auxiliary support rails 14 are fixed on the upper end surface of the fixed side connection plates 12 between two adjacent main support rails 13, the upper end surfaces of the main support rails 13 and the auxiliary support rails 14 are both connected to the upper connection plate 15, the main support rails 13, the auxiliary support rails 14 and the upper connection plate 15 are arranged to protect two sides of the bridge deck, so that the stability of the whole bridge is improved, the safety of the whole bridge is improved, and the safety of personnel is guaranteed.
Referring to fig. 3, the supporting component 2 includes two sets of main supporting piles 21, supporting frame seats 22, sleeving holes 23 and sleeving fixing rods 24, the main supporting piles 21 are respectively fixed on the bridge component 1, the bottom ends of the main supporting piles 21 penetrate through the bridge component 1 to be connected with a pier in a pouring manner, the top ends of the two sets of main supporting piles 21 are transversely connected with the supporting frame seats 22, the sleeving holes 23 for the rope hanging rods 3 to penetrate through and fix are formed in the two sides of the supporting frame seats 22, the upper ends of the sleeving fixing rods 24 are fixedly sleeved on the rope hanging rods 3, the lower portions of the sleeving fixing rods 24 are fixedly installed on the upper connecting plate 15, the supporting component 2 effectively supports the rope hanging rods 3, the whole bridge is pulled to be supported, the overall stability is guaranteed, and large-amplitude shaking is avoided.
Referring to fig. 4, the fixing member 4 includes an upper connection ring 41, a lower connection ring 42, a clamping groove 43 and a connection welding plate 44, the inner ends of the upper connection ring 41 and the lower connection ring 42 are respectively provided with the corresponding clamping groove 43, the two ends of the upper connection ring 41 and the lower connection ring 42 are respectively welded with the welding plate 44, the lower connection ring 42 is fixed at the top end of the sleeve connection fixing rod 24, the upper connection ring 41 and the lower connection ring 42 are installed by being fixed by bolts through the connection welding plate 44 at the two ends, the suspension cable rod 3 is wrapped in the clamping groove 43 between the upper connection ring 41 and the lower connection ring 42, the suspension cable rod 3 is wrapped inside by the hoops of the upper connection ring 41 and the lower connection ring 42, the installation is effectively performed, and the anti-vibration effect of the whole suspension cable rod 3 is improved.
Referring to fig. 5-6, the drainage assembly 5 includes a drainage channel 51, a left-side channel 52, a right-side channel 53 and a water outlet 54, the drainage channel 51 is transversely disposed in the transverse bridge deck 11, the left-side channel 52 is disposed on the left side inside the drainage channel 51, the two ends of the drainage channel 51 of the right-side channel 53 are disposed on the right side inside the drainage channel 51 and connected to the water outlet 54, the water outlet 54 is disposed in the fixed side connection plate 12, the drainage assemblies 5 are disposed in multiple groups and are disposed in the transverse bridge deck 11 side by side, and the drainage channel 51 is disposed for draining water on the bridge deck, so that rainwater can be collected and drained, the drainage efficiency of the whole bridge deck is improved, rainwater is prevented from pressurizing the bridge deck, bridge load is reduced, and the service life of the bridge is prolonged.
Referring to fig. 7-8, the cleaning assembly 6 includes a screw rod 61, a directional rod 62, a gear shaft 63, a sliding sleeve ring 64, a connecting plate 65, a cleaning brush 66 and a power assembly 67, the screw rod 61 is disposed in the left-disposed tank 52, the directional rod 62 is disposed in the right-disposed tank 53, the gear shaft 63 is engaged and sleeved on the screw rod 61, the sliding sleeve ring 64 is movably sleeved on the directional rod 62, the gear shaft 63 and the sliding sleeve ring 64 are connected by the connecting plate 65, the cleaning brush 66 is disposed under the connecting plate 65, the cleaning brush 66 is attached and connected with the bottom end of the drain tank 51, the power assembly 67 includes a cleaning motor 671, a linkage chain belt 672 and a sleeve gear 673, the cleaning motor 671 is connected with one end of a group of screw rods 61, the screw rods 61 are provided with a plurality of groups, one section of the plurality of groups of screw rods 61 is provided with the sleeve gear 673, the sleeve gears 673 on the screw rods 61 are sleeved by the linkage chain belt 672, the cleaning motor 671 drives the plurality of groups of the sleeve gears 673 to rotate through linkage, thereby drive the gear shaft 63 on the lead screw 61 and remove, when the gear shaft 63 removed, slip lantern ring 64 and connecting plate 65 removed together, and connecting plate 65 drives clearance brush 66 and clears up in to water drainage tank 51 when removing, prevents that water drainage tank 51 from blockking up, improves cleaning efficiency in water drainage tank 51, guarantees inside cleanness, prevents that debris from blockking up and leading to unable drainage.
Referring to fig. 9, the forward row assembly 7 includes an inner drainage groove 71, inclined through holes 72 and inner vertical drainage grooves 73, the inner drainage groove 71 is formed at the upper end of the horizontal bridge deck 11, a plurality of sets of inclined through holes 72 are formed at both sides of the inner drainage groove 71, the inner vertical drainage grooves 73 are formed below both ends of the inner drainage groove 71, the water flow delivery efficiency is improved by the plurality of inclined through holes 72, and the inner vertical drainage grooves 73 are formed at both ends of the inner drainage groove 71, so that the water flow is guided vertically.
In order to better show the process of the bridge deck drainage device for the bridge, the embodiment provides an implementation method of the bridge deck drainage device for the bridge, which comprises the following steps:
the method comprises the following steps: the main supporting pile 21 supports the sling rod 3 and the bridge component 1, and the sling rod 3 is fixedly sleeved on the sleeved fixing rods 24 at the two sides of the main supporting pile 21 through the fixing pieces 4 for fixing;
step two: the drainage channel 51 is used for draining water on the bridge floor, so that rainwater can be collected and drained, and the drainage efficiency of the whole bridge floor is improved;
step three: the clearance motor 671 drives the multiunit lead screw 61 that cup joints in the gear 673 through the linkage chain belt 672 and rotates to drive the gear shaft 63 on the lead screw 61 and remove, when the gear shaft 63 removed, the slip lantern ring 64 removed together with connecting plate 65, and connecting plate 65 when removing, drives clearance brush 66 and clears up in to water drainage tank 51, prevents that water drainage tank 51 from blockking up.
Example two:
referring to fig. 10, a bridge deck drainage device for a bridge and an implementation method thereof include a bridge assembly 1, a support assembly 2 is arranged above the bridge assembly 1, two ends of two side surfaces of the support assembly 2 are respectively provided with a sling rod 3, a fixing member 4 is arranged below the sling rod 3, a drainage assembly 5 is arranged on a bridge deck of the bridge assembly 1, a cleaning assembly 6 is arranged inside the drainage assembly 5, the cleaning assembly 6 is arranged inside the bridge deck of the bridge assembly 1, a row assembly 7 is arranged in the top end of the support assembly 2, a reinforcing assembly 8 is arranged inside the bridge assembly 1, the bridge assembly 1 includes a transverse bridge panel 11, a fixed side connecting plate 12, a main supporting rail 13, an auxiliary supporting rail 14 and an upper connecting plate 15, two sides of the transverse bridge panel 11 are respectively connected with the fixed side connecting plate 12, a plurality of main supporting rails 13 are fixed on the upper end surface of the fixed side connecting plate 12, a plurality of auxiliary supporting rails 13 are fixed on the upper end surface of the fixed side connecting plate 12 between two adjacent main supporting rails 13, and a plurality of auxiliary supporting rails are fixed on the upper end surface of the fixed side connecting plate 12 14, the up end of main tributary stay railing 13 and vice stay railing 14 all is connected with fishplate bar 15, protects the bridge floor both sides through setting up main stay railing 13, vice stay railing 14 and fishplate bar 15, when improving whole pontic stability, increases the security of whole pontic, guarantees personnel's safety.
Referring to fig. 11, the installation and reinforcement assembly 8 includes a plurality of cross-over inner grooves 81, cross-over teeth 82, inner rubber layers 83 and reinforcement steel plates 84, the cross-over inner grooves 81 are formed at the side ends of the transverse bridge panels 11, the number of the cross-over inner grooves 81 is the same as that of the cross-over inner grooves 81, the cross-over teeth 82 are fixed at the side ends of the adjacent transverse bridge panels 11, the cross-over teeth 82 are engaged with the cross-over inner grooves 81, the lower portions of the adjacent two transverse bridge panels 11 are fixed by the reinforcement steel plates 84, and the cross-over installation structure prevents the transverse bridge panels 11 from being dislocated, reduces the moving space, ensures the tightness after installation, increases the friction of the inner rubber layers 83, improves the tightness and reinforcement effect after installation, increases the stability of use, and ensures the reinforcement of the joints by the reinforcement steel plates 84.
In summary, in the bridge deck drainage device and the implementation method thereof provided by the present invention, the top ends of two sets of main support piles 21 are transversely connected with the support frame seat 22, the two sides of the support frame seat 22 are provided with the sleeve holes 23 for the rope hanging rods 3 to penetrate and fix, the upper ends of the sleeve fixed rods 24 are fixedly sleeved on the rope hanging rods 3, the lower parts of the sleeve fixed rods 24 are fixedly mounted on the upper connecting plate 15, the support assemblies 2 effectively support the rope hanging rods 3, pull the whole bridge body to support, ensure the whole stability, avoid large swing, the water outlets 54 are arranged in the fixed side connecting plate 12, the drainage assemblies 5 are provided with a plurality of sets, are all arranged in parallel in the transverse bridge deck 11, and the drainage grooves 51 are arranged to drain the bridge deck, so that rainwater can be collected and drained, the drainage efficiency of the whole bridge deck is improved, rainwater is prevented from pressurizing the bridge deck, and the bridge burden is reduced, the service life of the bridge is prolonged, a cleaning motor 671 is connected with one end of a group of screw rods 61, the screw rods 61 are provided with a plurality of groups, one section of each group of screw rods 61 is provided with a sleeve gear 673, the sleeve gears 673 on the screw rods 61 are sleeved by a linkage chain belt 672, the cleaning motor 671 drives the plurality of groups of screw rods 61 in the sleeve gears 673 to rotate through the linkage chain belt 672 so as to drive a gear shaft 63 on the screw rods 61 to move, the gear shaft 63 moves while a sliding sleeve ring 64 and a connecting plate 65 move together, the connecting plate 65 drives a cleaning brush 66 to clean the inside of a water drainage tank 51 when moving, so that the water drainage tank 51 is prevented from being blocked, the cleaning efficiency in the water drainage tank 51 is improved, the internal cleaning is ensured, the drainage failure caused by the blockage of sundries is prevented, a plurality of groups of auxiliary supporting railings 14 are fixed on the upper end faces of fixed side connecting plates 12 between two adjacent main supporting railings 13, and the upper end faces of the auxiliary supporting railings 14 are both connected with an upper connecting plate 15, through setting up main support railing 13, vice support railing 14 and upper connecting plate 15 protect the bridge floor both sides, when improving whole pontic stability, increase the security of whole pontic, guarantee personnel's safety, handing-over inside groove 81 is provided with a plurality ofly, the quantity that staggered tooth 82 set up is the same with handing-over inside groove 81, staggered tooth 82 fixes at adjacent horizontal bridge panel 11 side, staggered tooth 82 and handing-over inside groove 81 meshing, two adjacent horizontal bridge panel 11's below is fixed by reinforcing steel sheet 84, staggered type mounting structure, prevent horizontal bridge panel 11 dislocation, reduce the migration space, guarantee the fastening nature after the installation, interior glue film 83 increases the friction, improve installation back leakproofness and reinforcement effect, increase the stability of use, consolidate through reinforcing steel sheet 84, guarantee the reinforcement of junction.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be able to cover the technical solutions and the inventive concepts of the present invention within the technical scope of the present invention.
- 上一篇:石墨接头机器人自动装卡簧、装栓机
- 下一篇:一种桥梁的防落物墙