Project management method, system, computer device and storage medium

文档序号:9007 发布日期:2021-09-17 浏览:36次 中文

1. A method for project management, the method comprising:

acquiring demand information of a research and development project, and determining a work type required for completing the research and development project according to the demand information;

acquiring a plurality of personnel information, wherein the personnel information comprises the work types of workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information;

and determining executive personnel of the research and development project from the working personnel corresponding to the personnel information according to the work type required by the research and development project and the personnel information.

2. The method according to claim 1, wherein each currently responsible research and development project includes at least one work task, the plurality of staff information further includes a work duration for a corresponding staff to complete each work task in the currently responsible research and development project, and the determining, according to the work type required by the research and development project and the plurality of staff information, an executive of the research and development project from staff corresponding to the plurality of staff information includes:

screening candidate workers matched with the work types required by the research and development project from the workers corresponding to the plurality of personnel information;

for the personnel information of the candidate workers including the same type of work category, determining the historical working time length of the candidate workers within the preset historical working time length according to the working time length of the corresponding worker for completing each working task in the currently responsible research and development project;

and determining the candidate staff with the minimum historical working time as the executive staff of the research and development project.

3. The method of claim 2, wherein the historical working hours comprise an average working hour for the worker to complete one of the responsible research and development projects within the preset historical working hours, or a total working hour for the worker to complete all of the working tasks in the responsible research and development projects within the preset historical working hours.

4. The method of claim 1, further comprising:

carrying out cost calculation on the research and development project according to the material cost and the personnel cost of the research and development project to obtain the research and development cost of the research and development project; the personnel cost is determined by the working time of the executive personnel of the research and development project to actually complete the research and development project;

determining the project prize of the executive personnel of the research and development project according to the research and development cost and the actual sales volume of the research and development project.

5. The method of claim 4, wherein determining the project prize for the implementer of the development project based on the development cost and the actual sales of the development project comprises:

calculating the project profit of the research and development project by adopting the research and development cost and the actual sales;

acquiring the post, the post level and the working year of the executive personnel, and determining the bonus proportion corresponding to the executive personnel;

and determining the project bonus of the executive personnel according to the project profit and the bonus proportion.

6. The method of claim 1, further comprising:

determining a plurality of development stages of the development project and the estimated cost of each development stage;

calculating the current research and development cost according to the material cost and the personnel cost consumed when the research and development project is carried out to the current research and development stage;

comparing the current research and development cost with the estimated cost corresponding to the current research and development stage, and if the current research and development cost is greater than the estimated cost, outputting early warning information; wherein the early warning information is used for prompting that the current development cost is beyond expectation.

7. The method of claim 1, further comprising:

acquiring the after-sale problem of the research and development project, analyzing the after-sale problem, and determining a target work type for solving the after-sale problem;

determining an after-sales resolvers matched with the target work type from executive personnel of the research and development project;

sending the after-sale problem to equipment of the after-sale resolvers, and prompting the after-sale resolvers to determine a solution of the after-sale problem;

receiving the solution from the after-market solver's device.

8. A project management system, characterized in that the system comprises:

the system comprises a requirement determining module, a data processing module and a data processing module, wherein the requirement determining module is used for acquiring requirement information of a research and development project and determining a work type required for completing the research and development project according to the requirement information;

the personnel determining module is used for acquiring a plurality of personnel information, and the personnel information comprises the work types of the workers corresponding to the personnel information and the currently responsible research and development projects of the workers corresponding to the personnel information;

and the execution determining module is used for determining the executive personnel of the research and development project from the staff corresponding to the staff information according to the work type required by the research and development project and the staff information.

9. A computer device comprising a memory and a processor, the memory storing a computer program, wherein the processor implements the steps of the method of any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the steps of the method of any one of claims 1 to 7.

Background

With the rapid development and rapid increase of the scale of modern enterprise business, project management systems for realizing the life cycle of enterprise projects from client development, project research and development to after-sale maintenance are increasingly applied to the enterprises at present.

The existing project management system is only used for realizing the centralized management of enterprise projects, and cannot realize timely paying attention to the working condition of staff and dynamically adjusting the working requirement of the staff, so that the management requirement of being suitable for people and posts is met.

In the conventional technology, workers report work reports (daily reports and weekly reports) through a project management system, a manager refers to and analyzes the work report of each worker to correspondingly allocate research and development projects for each worker, and correspondingly manages each research and development project, and the project management method is long in time consumption and low in efficiency.

Disclosure of Invention

In view of the above, it is necessary to provide a project management method, system, computer device and storage medium for the above technical problems.

A method of project management, comprising:

acquiring the requirement information of a research and development project, and determining the work type required for completing the research and development project according to the requirement information;

acquiring a plurality of personnel information, wherein the personnel information comprises the work types of workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information;

determining executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

In one embodiment, each currently responsible research and development project includes at least one work task, the multiple pieces of staff information further include a work duration for a corresponding staff to complete each work task in the currently responsible research and development project, and the determining executive staff of the research and development project from the staff corresponding to the multiple pieces of staff information according to the work type and the multiple pieces of staff information required by the research and development project includes:

screening candidate workers of which the work types are matched with the work types required by the research and development project from the workers corresponding to the plurality of personnel information;

for the staff information of the candidate staff including the same type of work types, determining the historical working time length of the candidate staff in the preset historical time length according to the working time length of each working task in the currently responsible research and development project completed by the corresponding staff;

and determining the candidate staff with the minimum historical working time as the executive staff of the research and development project.

In one embodiment, the historical working time includes an average working time for a worker to complete one working task in the responsible research and development project within a preset historical time, or a total working time for the worker to complete all working tasks in the responsible research and development project within the preset historical time.

In one embodiment, the method further includes:

carrying out cost calculation on the research and development project according to the material cost and the personnel cost of the research and development project to obtain the research and development cost of the research and development project; the personnel cost is determined by the working time of the executive personnel of the research and development project to actually complete the research and development project;

the project prize of the executives of the development project is determined according to the development cost and the actual sales of the development project.

In one embodiment, determining a project prize for a developer of a development project based on development costs and actual sales of the development project includes:

calculating the project profit of the research and development project by adopting the research and development cost and the actual sales;

acquiring the post, the post level and the working year of the executive personnel to determine the bonus proportion of the corresponding executive personnel;

and determining the project bonus of the executive personnel according to the project profit and the bonus proportion.

In one embodiment, the method further includes:

determining a plurality of research and development stages of a research and development project and the estimated cost of each research and development stage;

calculating the current research and development cost according to the material cost and the personnel cost consumed when the research and development project is carried out to the current research and development stage;

comparing the current research and development cost with the estimated cost corresponding to the current research and development stage, and if the current research and development cost is greater than the estimated cost, outputting early warning information; wherein the early warning information is used to indicate that the current development cost is beyond expectations.

In one embodiment, the method further includes:

acquiring after-sale problems of research and development projects, analyzing the after-sale problems, and determining a target work type for solving the after-sale problems;

determining an after-sale solving person matched with the target work type from executive persons of the research and development project;

sending the after-sale problem to equipment of an after-sale solver, and prompting the after-sale solver to determine a solution of the after-sale problem;

a solution is received from an after-market solver's device.

A project management system, comprising:

the demand determining module is used for acquiring demand information of the research and development project and determining the work type required by the research and development project according to the demand information;

the personnel determining module is used for acquiring a plurality of personnel information, and the personnel information comprises the work types of the workers corresponding to the personnel information and the currently responsible research and development projects of the workers corresponding to the personnel information;

and the execution determining module is used for determining the executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

A computer device comprising a memory and a processor, the memory storing a computer program, the processor implementing the following steps when executing the computer program:

acquiring the requirement information of a research and development project, and determining the work type required for completing the research and development project according to the requirement information;

acquiring a plurality of personnel information, wherein the personnel information comprises the work types of workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information;

determining executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

A computer-readable storage medium, on which a computer program is stored which, when executed by a processor, carries out the steps of:

acquiring the requirement information of a research and development project, and determining the work type required for completing the research and development project according to the requirement information;

acquiring a plurality of personnel information, wherein the personnel information comprises the work types of workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information;

determining executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

According to the project management method, the system, the computer equipment and the storage medium, through acquiring the requirement information of the research and development project, the work type required by the research and development project is determined according to the requirement information, the work type of the staff corresponding to the staff information and the plurality of staff information of the currently responsible research and development project are acquired, and the executive personnel of the research and development project is determined from the staff corresponding to the staff information according to the work type and the plurality of staff information required by the research and development project, so that the reasonable distribution of the research and development project is realized, the manager is assisted to select the proper staff to distribute to the corresponding work post, and the project management efficiency is improved while the requirement of the proper staff management is met.

Drawings

FIG. 1 is a flow diagram illustrating a method for project management in one embodiment;

FIG. 2 is a schematic flow diagram illustrating determination of executives corresponding to a development project, in accordance with an embodiment;

FIG. 3 is a flow diagram illustrating item settlement in one embodiment;

FIG. 4 is a flow diagram illustrating the determination of a bonus of an executive project, in one embodiment;

FIG. 5 is a schematic diagram illustrating an embodiment of a process for early warning of development cost overdue;

FIG. 6 is a schematic diagram of a process for feedback and resolution of an after-market problem in one embodiment;

FIG. 7 is a block diagram of the structure of a project management system in one embodiment;

FIG. 8 is a diagram illustrating an internal structure of a computer device according to an embodiment.

Detailed Description

In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.

In one embodiment, as shown in fig. 1, a project management method is provided, which is applicable to a server and also applicable to a system including a terminal and a server, and is implemented through interaction between the terminal and the server. The terminal can be, but is not limited to, various personal computers, notebook computers, smart phones, tablet computers and portable wearable devices, and the server can be implemented by an independent server or a server cluster formed by a plurality of servers. In this embodiment, the project management method is implemented by a project management system using a computer device as a carrier, and specifically includes the following steps:

and S110, acquiring the requirement information of the research and development project, and determining the work type required by the research and development project according to the requirement information.

The requirement information of the research and development project is specific content to be realized by the research and development project or a problem to be solved by the research and development project. For example, in order to solve the problem of vehicle cost management opaqueness in developing a vehicle service platform, a corresponding research and development project can be named as a vehicle service platform project, and the requirement information of the vehicle service platform project is a service platform for solving the problem of vehicle cost management opaqueness. The job type here may be a post of a worker, for example, a system framework engineer, a front end development engineer, a Java development engineer, or the like.

Optionally, the salesperson establishes a management task of the research and development project by logging in the project management system, and inputs corresponding research and development project information including information such as a project number, a project name, a client name, and a project content description, and the project management system acquires requirement information of the research and development project from the research and development project information input by the user, and determines the work type, i.e., the post, of the worker required to complete the research and development project according to the requirement information. Optionally, the management task of the research and development project is to perform management of the whole life-cycle process of the research and development project from before sale, development and after sale for each client-specific development project.

Optionally, the project management system may perform intelligent analysis on the project content description text including the demand information to obtain the work type of the staff required to implement the demand information, for example, the work type of the staff required to implement the demand information is obtained in a manner of keyword recognition and matching. For example, the work category of the worker matched by the keywords "research and development" and "service platform" may be at least one of a system framework engineer, a front end development engineer, a Java development engineer, a UI design engineer, and a test engineer.

Optionally, the research and development project information may further include a project development stage corresponding to the research and development project, such as sales promotion, customer contact, scheme exchange, business process, and the like, and the current project development stage may be determined according to the selection input of the salesperson. And different project development stages are correspondingly linked to different predicted single rate, further, the predicted sales income of the project development stages can be calculated according to the predicted sales amount and the predicted single rate corresponding to the current project development stage, and the predicted sales income of the corresponding research and development projects is displayed on a task management interface of the project management system. For example, the current project development stage of the car use service platform project is project exchange, the expected yield rate of the project exchange is 60%, the expected sales of the development project is 60 ten thousand yuan, and the estimated sales income of the corresponding project start is 60 ten thousand × 60% — 36 ten thousand yuan.

Alternatively, after the management task of the research and development project is established and the establishment of the research and development project is confirmed, the salesperson may search for a designated worker in the staff information prestored in the project management system to join in the corresponding research and development project, so as to serve as an executive staff of the corresponding research and development project.

And S120, acquiring a plurality of personnel information, wherein the personnel information comprises the work types of the workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information.

Optionally, the project management system pre-stores personnel information of the staff of each department, and the personnel information can be managed and deployed by the project management system. The staff information comprises the work type of the staff corresponding to the staff information and the currently responsible research and development project. Optionally, the project management system obtains all pre-stored personnel information, and may also determine a target department of required personnel according to the demand information, and further obtain personnel information of all the staff in the target department. For example, the project management system determines the target department of the required personnel as the software research and development department according to the requirement information of the vehicle service platform project, namely, providing a service platform for solving the problem of opaque vehicle cost management, and the project management system correspondingly acquires the personnel information of all the staff in the software research and development department.

Optionally, the staff information may specifically include related contents such as a name, a client, a progress, a start time, a work time for completing each work task, and an expected end time of the development project for which the corresponding staff is currently responsible. And under the condition that the personnel information comprises the working time of the corresponding staff for completing each working task in each research and development project, performing individual performance assessment on the staff according to the working time of the corresponding staff for completing each working task in each research and development project and the performance assessment of the department of the staff, and determining the individual work saturation of each staff and the department work saturation of the department of the staff.

Optionally, the staff information further includes basic information of staff corresponding to the staff information, such as name, age, contact information, academic calendar, profession, year of employment, post level, and the like, and may be created and updated by corresponding staff or management staff.

And S130, determining executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

Optionally, the project management system matches the work type required by the research and development project with the acquired multiple pieces of staff information, so as to filter out staff corresponding to the staff information including the work type matched with the work type required by the research and development project from the multiple pieces of staff information, and use the staff as candidate staff, then count the number of the research and development projects currently responsible by each candidate staff, and determine the candidate staff with the smallest number of the currently responsible research and development projects as an executive staff for executing the research and development projects.

Optionally, after screening out the candidate staff with the smallest number of currently responsible research and development projects from the candidate staff, the project management system may recommend the screened candidate staff to the project staff, and receive an adjustment operation of the screened candidate staff by the project staff to determine an executive staff of the research and development projects. For example, the project leader may comprehensively consider project arrangement, personal conditions, and other factors, delete some candidate workers automatically screened by the system, or add some candidate workers not recommended by the system, and finally obtain the executive staff of the research and development project.

In this embodiment, the project management method determines the work type required for completing the research and development project according to the demand information by obtaining the demand information of the research and development project, obtains the multiple pieces of staff information including the work type to which the staff corresponding to the staff information belongs and the currently responsible research and development project, and determines the executive staff of the research and development project from the staff corresponding to the multiple pieces of staff information according to the work type and the multiple pieces of staff information required for the research and development project, so as to implement reasonable allocation of the research and development project, assist the manager in selecting suitable staff to allocate to corresponding work posts, and improve the project management efficiency while meeting the requirement of suitable staff for post management.

In an embodiment, to improve the reasonableness of determining the executive corresponding to the research and development project to promote the research and development progress, the staff information further includes the work tasks of the research and development project that the staff reports and is responsible for and the work duration for completing the corresponding work task, each research and development project includes at least one work task, as shown in fig. 2, the S130 includes:

s210, screening candidate workers of which the work types are matched with the work types required by the research and development project from the workers corresponding to the plurality of personnel information.

Specifically, the project management system extracts the work types in the multiple personnel information, compares the obtained work types required by the research and development project with the extracted work types, and screens out the candidate workers of the work types corresponding to the multiple personnel information, wherein the work types are matched with the work types required by the research and development project, namely the candidate workers of the work types required by the research and development project are included in the corresponding personnel information. For example, the work types extracted from the information of the multiple personnel include a system framework engineer, a front-end development engineer, a Java development engineer, a C + + development engineer, a data development engineer, a UI design engineer and a test engineer, the work types required for developing the project include the front-end development engineer, the Java development engineer and the test engineer, and the project management system determines the multiple corresponding personnel information including the work types as the front-end development engineer, the Java development engineer and the test engineer as candidate personnel.

S220, determining the historical working time length of the candidate staff in the preset historical time length according to the working time length of the corresponding staff for completing each working task in the currently responsible research and development project for the staff information of the candidate staff comprising the same work type.

Optionally, the historical working duration includes an average working duration of the worker completing one working task in the responsible research and development project within a preset historical duration, or a total working duration of the worker completing all working tasks in the responsible research and development project within the preset historical duration.

Optionally, the project management system divides the staff information of the candidate staff according to the work category, and calculates, for the staff information of the candidate staff including the same work category, an average work duration for the staff to complete one work task in the responsible research and development project within a preset historical work duration, or a total work duration for completing all work tasks in the responsible research and development project.

And S230, determining the candidate staff with the minimum historical working time as the executive staff of the research and development project.

Specifically, the project management system determines that the candidate worker with the minimum average working time for completing one working task in the responsible research and development project is the executive worker of the research and development project, or the project management system determines that the candidate worker with the minimum total working time for completing all working tasks in the responsible research and development project is the executive worker of the research and development project, that is, the candidate worker with the highest working efficiency or the lowest working degree is selected as the executive worker of the research and development project.

In this embodiment, the project management method screens candidate workers of a work type matched with a work type required by a research and development project from among workers corresponding to a plurality of worker information, determines a historical work duration of the candidate workers within a preset historical time duration according to a work duration of each work task in the research and development project for which the corresponding worker completes the current responsibility, and further determines the candidate worker with the smallest historical work duration as an executive of the research and development project, so that the candidate worker with the highest work efficiency or the candidate worker with the lowest work efficiency is selected as the executive of the research and development project, thereby improving the rationality of determining the executive corresponding to the research and development project and further promoting the research and development progress.

In one embodiment, the project management method further includes a project settlement process, specifically including an automatic settlement process of the development cost of the development project, the profitability of the project, and the project prize money of the executives participating in each development project, as shown in fig. 3, and the method further includes:

and S310, carrying out cost calculation on the research and development project according to the material cost and the personnel cost of the research and development project to obtain the research and development cost of the research and development project.

The personnel cost is determined by the working time of the executive personnel of the research and development project for actually completing the research and development project.

Specifically, the project management system obtains the expenditure of the user for the corresponding research and development project, for example, the purchase expense and the travel expense of the software/hardware device, takes the expenditure of the expenditure as the material cost of the corresponding research and development project, and determines the personnel cost according to the working duration of the executive personnel of the research and development project to actually complete the research and development project, for example, after the research and development project is actually completed, the total working duration of all the executive personnel of the corresponding research and development project is counted and multiplied by the cost unit price to obtain the personnel cost of completing the corresponding research and development project, and the sum of the material cost and the personnel cost is calculated to obtain the research and development cost of the corresponding research and development project.

And S320, determining the project prize of the executive personnel of the research and development project according to the research and development cost and the actual sales volume of the research and development project.

Optionally, after the product corresponding to the research and development project is sold, the salesperson may enter an actual sales amount of the corresponding research and development project through the project management system, and the project management system determines a project prize money of each executive participating in the corresponding research and development project according to the entered actual sales amount and the calculated research and development cost.

In an alternative embodiment, to improve the rationality of the bonus allocation for the project, as shown in fig. 4, the above S320 includes:

and S410, calculating the project profit of the research and development project by adopting the research and development cost and the actual sales.

Specifically, the project management system obtains the project profit of the corresponding research and development project by subtracting the research and development cost from the actual sales.

And S420, acquiring the post, the post level and the working year of the executive personnel and determining the proportion of the bonus corresponding to the executive personnel.

Specifically, the project management system extracts the post, the post level and the working year of the executor corresponding to the research and development project, and determines the bonus proportion of the executor participating in the corresponding research and development project according to the corresponding relationship between the preset post, the post level, the working year and the bonus proportion.

And S430, determining the project bonus of the executive staff according to the project profit and the bonus proportion.

Specifically, for each executive in the development project, the project management system multiplies the assignable part in the project profit by the prize proportion corresponding to the executive to obtain the project prize of the executive in the corresponding development project. For example, the project profit of the development project a is calculated to be 10 ten thousand yuan, the corresponding assignable portion is 1 ten thousand yuan which is 10% of the project profit, the executive personnel corresponding to the development project a includes executive personnel 1 to 5, the corresponding prize proportions are 40%, 30%, 10%, 10%, and 10%, accordingly, the project prize of the executive personnel 1 is 1 ten thousand yuan by 40% to 4000 yuan, the project prize of the executive personnel 2 is 1 ten thousand yuan by 30% to 3000 yuan, and the project prizes of the executive personnel 3 to 5 are all 1 ten thousand yuan by 10% to 1000 yuan.

In this embodiment, the project management method performs cost calculation on the research project through the material cost and the personnel cost of the research project to obtain the research and development cost of the research and development project, further determines the project bonus of the executive personnel of the research and development project according to the research and development cost and the actual sales volume of the research and development project, specifically calculates the project profit of the research and development project by using the research and development cost and the actual sales volume, and obtains the position, the position level and the entry years of the executive personnel to determine the bonus proportion of the bonus corresponding executive personnel, and determines the project bonus of the executive personnel according to the project profit and the bonus proportion, so that the project bonus of the executive personnel participating in the research and development project is automatically determined, and the determination of the bonus proportion integrates the comprehensive consideration of the executive personnel in the aspects of the position, the position level and the entry years, and further improves the reasonability of project bonus allocation.

In an embodiment, the project management method further includes an overdue early warning for the development cost to remind an executive of the corresponding development project to control the development cost, as shown in fig. 5, and the method further includes:

s510, determining a plurality of development stages of the development project and the estimated cost of each development stage.

Specifically, an executive carries out research and development stage division on a responsible research and development project by logging in a project management system, and inputs the corresponding estimated cost of each research and development stage, and the project management system acquires the research and development stages divided by the executive and the corresponding estimated cost of each research and development stage. For example, the development phase can be divided into a system building phase, a main body development phase, an interface design phase, an integration debugging phase and a running test phase according to specific development work.

And S520, calculating the current research and development cost according to the material cost and the personnel cost consumed when the research and development project is carried out to the current research and development stage.

Optionally, the executive personnel logs in the current research and development stage of the research and development project through the project management system, or the project management system determines the current research and development stage of the research and development project at the current moment according to the work tasks logged in by the executive personnel, and the project management system obtains the sum of the material cost and the personnel cost consumed by the corresponding research and development project before the current moment as the current research and development cost. For example, if the project management system performs interface animation design according to a work task which is input by an executive and is closest to the current time, the current research and development stage of the research and development project by the current time is determined as an interface design stage, and the sum of the material cost and the personnel cost consumed by the corresponding research and development project before the current time is obtained to obtain the current research and development cost of the research and development project.

S530, comparing the current research and development cost with the estimated cost corresponding to the current research and development stage, and outputting early warning information if the current research and development cost is larger than the estimated cost.

Wherein the early warning information is used to indicate that the current development cost is beyond expectations.

Specifically, the project management system obtains the estimated cost corresponding to the current research and development stage of the corresponding research and development project, compares the current research and development cost with the estimated cost corresponding to the current research and development stage, and determines whether to output the early warning information according to the comparison result. For example, the current research and development stage is an interface design stage, the corresponding estimated cost is 80% of the preset total estimated cost, and if the current research and development cost is greater than 80% of the preset total estimated cost (the estimated cost corresponding to the interface design stage), the project management system outputs an early warning message to prompt that the current research and development cost of the current research and development stage exceeds the expectation.

In this embodiment, the project management system calculates the current research and development cost according to the material cost and the personnel cost consumed by the research and development project in the current research and development stage and the estimated cost of each research and development stage by determining the multiple research and development stages of the research and development project, and then compares the current research and development cost with the estimated cost corresponding to the current research and development stage, and if the current research and development cost is greater than the estimated cost, outputs the early warning information to prompt the executive that the current research and development cost of the current research and development stage exceeds the expected cost, and timely performs in-flight early warning, thereby being beneficial for the executive to reasonably control the research and development cost of the later stage and avoiding the research and development cost exceeding the expected cost.

In an embodiment, the project management method further includes feedback and resolution of an after-sales problem, and as shown in fig. 6, the method further includes:

s610, acquiring the after-sale problem of the research and development project, analyzing the after-sale problem, and determining the target work type for solving the after-sale problem.

Specifically, after-sales personnel enter the after-sales problems of the corresponding research and development projects by logging in the project management system, and the project management system performs keyword recognition on the after-sales problems to obtain target work types for solving the after-sales problems. For example, the after-sales problem acquired by the project management system is that the interface taskbar name is not fully displayed, the keyword "interface" is recognized and "displayed", and the target type for solving the after-sales problem is identified as the UI design engineer.

And S620, determining an after-sales resolvent matched with the target work type from executive personnel of the research and development project.

S630, sending the after-sale problem to equipment of the after-sale solver, and prompting the after-sale solver to determine a solution of the after-sale problem.

S640, receiving a solution from the equipment of the after-sales resolvers.

Specifically, the project management system determines, from the executives of the research and development project, an executor corresponding to a target job type, that is, the same job type as the target job type, as an after-sales solver, and sends the after-sales problem to the device of the after-sales solver to prompt the after-sales solver to determine a solution to the after-sales problem, and at the same time, receives a solution fed back from the device of the after-sales solver, so that the after-sales person can reach the user and solve the corresponding after-sales problem.

In this embodiment, the project management method obtains the after-sales problem of the research and development project, analyzes the after-sales problem, determines a target job type for solving the after-sales problem, determines an after-sales solver matched with the target job type from executives of the research and development project, and sends the after-sales problem to a device of the after-sales solver to prompt the after-sales solver to determine a solution to the after-sales problem, and meanwhile, receives the solution from the device of the after-sales solver, thereby implementing feedback and solution of the after-sales problem, and implementing effective after-sales management of the research and development project.

It should be understood that although the various steps in the flow charts of fig. 1-6 are shown in order as indicated by the arrows, the steps are not necessarily performed in order as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least some of the steps in fig. 1-6 may include multiple steps or multiple stages, which are not necessarily performed at the same time, but may be performed at different times, which are not necessarily performed in sequence, but may be performed in turn or alternately with other steps or at least some of the other steps.

The standardized (Guideline) project management process is constructed through the project management method, appropriate executive personnel are matched for the research and development project according to the requirement information of the research and development project and the personnel information of the workers, the integration and allocation (Gather) of manpower and project resources are realized, the cost target management and control (Goal) is realized for the overdue early warning of the research and development cost, the performance assessment (Govern) to personnel and departments is realized for the research and development project which is responsible for the workers and the recording of the working time of each worker in the corresponding research and development project, the realization (Guarantee) of the method is ensured through the project management system corresponding to the project management method, and the 5G management mode of the research and development project operation is integrally realized.

In one embodiment, as shown in FIG. 7, there is provided a project management system comprising: a requirement determining module 701, a personnel determining module 702, and an execution determining module 703, wherein:

the requirement determining module 701 is used for acquiring requirement information of a research and development project and determining a work type required for completing the research and development project according to the requirement information;

the personnel determining module 702 is configured to obtain a plurality of personnel information, where the personnel information includes a work category to which a worker corresponding to the personnel information belongs and a currently responsible research and development project of the worker corresponding to the personnel information;

the execution determining module 703 is configured to determine an executive member of the research and development project from staff members corresponding to a plurality of staff information according to a work type and a plurality of staff information required by the research and development project.

In one embodiment, each currently responsible research and development project includes at least one work task, the plurality of personnel information further includes a work duration for the corresponding worker to complete each work task in the currently responsible research and development project, and the execution determining module 703 is specifically configured to:

screening candidate workers of which the work types are matched with the work types required by the research and development project from the workers corresponding to the plurality of personnel information; for the staff information of the candidate staff including the same type of work types, determining the historical working time length of the candidate staff in the preset historical time length according to the working time length of each working task in the currently responsible research and development project completed by the corresponding staff; and determining the candidate staff with the minimum historical working time as the executive staff of the research and development project.

In one embodiment, the historical working time includes an average working time for a worker to complete one working task in the responsible research and development project within a preset historical time, or a total working time for the worker to complete all working tasks in the responsible research and development project within the preset historical time.

In one embodiment, the system further comprises an item settlement module, wherein the item settlement module is configured to:

carrying out cost calculation on the research and development project according to the material cost and the personnel cost of the research and development project to obtain the research and development cost of the research and development project; the personnel cost is determined by the working time of the executive personnel of the research and development project to actually complete the research and development project; the project prize of the executives of the development project is determined according to the development cost and the actual sales of the development project.

In one embodiment, the item settlement module is specifically configured to:

calculating the project profit of the research and development project by adopting the research and development cost and the actual sales; acquiring the post, the post level and the working year of the executive personnel to determine the bonus proportion of the corresponding executive personnel; and determining the project bonus of the executive personnel according to the project profit and the bonus proportion.

In one embodiment, the system further includes an early warning management and control module, and the early warning management and control module is configured to:

determining a plurality of research and development stages of a research and development project and the estimated cost of each research and development stage; calculating the current research and development cost according to the material cost and the personnel cost consumed when the research and development project is carried out to the current research and development stage; comparing the current research and development cost with the estimated cost corresponding to the current research and development stage, and if the current research and development cost is greater than the estimated cost, outputting early warning information; wherein the early warning information is used to indicate that the current development cost is beyond expectations.

In one embodiment, the system further comprises an after-market feedback module, wherein the after-market feedback module is configured to:

acquiring after-sale problems of research and development projects, analyzing the after-sale problems, and determining a target work type for solving the after-sale problems; determining an after-sale solving person matched with the target work type from executive persons of the research and development project; sending the after-sale problem to equipment of an after-sale solver, and prompting the after-sale solver to determine a solution of the after-sale problem; a solution is received from an after-market solver's device.

For the specific definition of the project management system, reference may be made to the above definition of the project management method, which is not described herein again. The various modules in the project management system described above may be implemented in whole or in part by software, hardware, and combinations thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.

In one embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as shown in fig. 8. The computer device includes a processor, a memory, a communication interface, a display screen, and an input device connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The communication interface of the computer device is used for carrying out wired or wireless communication with an external terminal, and the wireless communication can be realized through WIFI, an operator network, NFC (near field communication) or other technologies. The computer program when executed by a processor implements a project management system method. The display screen of the computer equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment can be a touch layer covered on the display screen, a key, a track ball or a touch pad arranged on the shell of the computer equipment, an external keyboard, a touch pad or a mouse and the like.

Those skilled in the art will appreciate that the architecture shown in fig. 8 is merely a block diagram of some of the structures associated with the disclosed aspects and is not intended to limit the computing devices to which the disclosed aspects apply, as particular computing devices may include more or less components than those shown, or may combine certain components, or have a different arrangement of components.

In one embodiment, a computer device is provided, comprising a memory and a processor, the memory having a computer program stored therein, the processor implementing the following steps when executing the computer program:

acquiring the requirement information of a research and development project, and determining the work type required for completing the research and development project according to the requirement information; acquiring a plurality of personnel information, wherein the personnel information comprises the work types of workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information; determining executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

In one embodiment, each currently responsible research and development project includes at least one work task, the plurality of personnel information further includes a work duration for the corresponding worker to complete each work task in the currently responsible research and development project, and the processor executes the computer program to further implement the following steps:

screening candidate workers of which the work types are matched with the work types required by the research and development project from the workers corresponding to the plurality of personnel information; for the staff information of the candidate staff including the same type of work types, determining the historical working time length of the candidate staff in the preset historical time length according to the working time length of each working task in the currently responsible research and development project completed by the corresponding staff; and determining the candidate staff with the minimum historical working time as the executive staff of the research and development project.

In one embodiment, the historical working time includes an average working time for a worker to complete one working task in the responsible research and development project within a preset historical time, or a total working time for the worker to complete all working tasks in the responsible research and development project within the preset historical time.

In one embodiment, the processor, when executing the computer program, further performs the steps of:

carrying out cost calculation on the research and development project according to the material cost and the personnel cost of the research and development project to obtain the research and development cost of the research and development project; the personnel cost is determined by the working time of the executive personnel of the research and development project to actually complete the research and development project; the project prize of the executives of the development project is determined according to the development cost and the actual sales of the development project.

In one embodiment, the processor, when executing the computer program, further performs the steps of:

calculating the project profit of the research and development project by adopting the research and development cost and the actual sales; acquiring the post, the post level and the working year of the executive personnel to determine the bonus proportion of the corresponding executive personnel; and determining the project bonus of the executive personnel according to the project profit and the bonus proportion.

In one embodiment, the processor, when executing the computer program, further performs the steps of:

determining a plurality of research and development stages of a research and development project and the estimated cost of each research and development stage; calculating the current research and development cost according to the material cost and the personnel cost consumed when the research and development project is carried out to the current research and development stage; comparing the current research and development cost with the estimated cost corresponding to the current research and development stage, and if the current research and development cost is greater than the estimated cost, outputting early warning information; wherein the early warning information is used to indicate that the current development cost is beyond expectations.

In one embodiment, the processor, when executing the computer program, further performs the steps of:

acquiring after-sale problems of research and development projects, analyzing the after-sale problems, and determining a target work type for solving the after-sale problems; determining an after-sale solving person matched with the target work type from executive persons of the research and development project; sending the after-sale problem to equipment of an after-sale solver, and prompting the after-sale solver to determine a solution of the after-sale problem; a solution is received from an after-market solver's device.

In one embodiment, a computer-readable storage medium is provided, having a computer program stored thereon, which when executed by a processor, performs the steps of:

acquiring the requirement information of a research and development project, and determining the work type required for completing the research and development project according to the requirement information; acquiring a plurality of personnel information, wherein the personnel information comprises the work types of workers corresponding to the personnel information and the research and development projects currently responsible for the workers corresponding to the personnel information; determining executive personnel of the research and development project from the staff corresponding to the staff information according to the work type and the staff information required by the research and development project.

In one embodiment, each currently responsible research and development project includes at least one work task, the plurality of personnel information further includes a work duration for the corresponding worker to complete each work task in the currently responsible research and development project, and the computer program, when executed by the processor, further implements the steps of:

screening candidate workers of which the work types are matched with the work types required by the research and development project from the workers corresponding to the plurality of personnel information; for the staff information of the candidate staff including the same type of work types, determining the historical working time length of the candidate staff in the preset historical time length according to the working time length of each working task in the currently responsible research and development project completed by the corresponding staff; and determining the candidate staff with the minimum historical working time as the executive staff of the research and development project.

In one embodiment, the historical working time includes an average working time for a worker to complete one working task in the responsible research and development project within a preset historical time, or a total working time for the worker to complete all working tasks in the responsible research and development project within the preset historical time.

In one embodiment, the computer program when executed by the processor further performs the steps of:

carrying out cost calculation on the research and development project according to the material cost and the personnel cost of the research and development project to obtain the research and development cost of the research and development project; the personnel cost is determined by the working time of the executive personnel of the research and development project to actually complete the research and development project; the project prize of the executives of the development project is determined according to the development cost and the actual sales of the development project.

In one embodiment, the computer program when executed by the processor further performs the steps of:

calculating the project profit of the research and development project by adopting the research and development cost and the actual sales; acquiring the post, the post level and the working year of the executive personnel to determine the bonus proportion of the corresponding executive personnel; and determining the project bonus of the executive personnel according to the project profit and the bonus proportion.

In one embodiment, the computer program when executed by the processor further performs the steps of:

determining a plurality of research and development stages of a research and development project and the estimated cost of each research and development stage; calculating the current research and development cost according to the material cost and the personnel cost consumed when the research and development project is carried out to the current research and development stage; comparing the current research and development cost with the estimated cost corresponding to the current research and development stage, and if the current research and development cost is greater than the estimated cost, outputting early warning information; wherein the early warning information is used to indicate that the current development cost is beyond expectations.

In one embodiment, the computer program when executed by the processor further performs the steps of:

acquiring after-sale problems of research and development projects, analyzing the after-sale problems, and determining a target work type for solving the after-sale problems; determining an after-sale solving person matched with the target work type from executive persons of the research and development project; sending the after-sale problem to equipment of an after-sale solver, and prompting the after-sale solver to determine a solution of the after-sale problem; a solution is received from an after-market solver's device.

It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database or other medium used in the embodiments provided herein can include at least one of non-volatile and volatile memory. Non-volatile Memory may include Read-Only Memory (ROM), magnetic tape, floppy disk, flash Memory, optical storage, or the like. Volatile Memory can include Random Access Memory (RAM) or external cache Memory. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM), among others.

The technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, but should be considered as the scope of the present specification as long as there is no contradiction between the combinations of the technical features.

The above-mentioned embodiments only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.