Floor mounting structure at water collector

文档序号:4256 发布日期:2021-09-17 浏览:53次 中文

1. A water collector floor mounting structure, comprising:

the guide heat-insulation board is provided with a groove for mounting a floor heating pipeline, and the bottom of the groove is provided with a plurality of carding channels for accommodating and clamping the floor heating pipeline;

a plurality of installation insulation boards are arranged, are arranged around the guide insulation board in a surrounding manner, and are provided with installation grooves communicated with the carding channel and used for clamping a floor heating pipeline;

the bearing plate is arranged below the guide heat-insulation plate and the installation heat-insulation plate, and is provided with an installation position for installing the guide heat-insulation plate and the installation heat-insulation plate;

and the supporting piece is arranged below the bearing plate and used for supporting the bearing plate to be fixed on the ground.

2. The structure of claim 1, wherein said combing channel is composed of a plurality of protrusions adjacently arranged, said combing channel is linearly arranged in a length direction thereof and two adjacent protrusions are arranged in a staggered manner with each other in a length direction thereof.

3. The structure for mounting the floor at the water collector as claimed in claim 1, wherein a plurality of guide posts are provided at an outlet of the combing channel, and a gap for passing a floor heating pipe is provided between two adjacent guide posts.

4. The structure for mounting a floor at a water collector as claimed in claim 1, wherein an inclined surface is provided in the groove below the water collector connection port, the inclined surface extending toward the bottom of the groove along a conveying direction of the floor heating pipe.

5. The floor mounting structure at the water collector of claim 2, wherein a fixing piece for fixing the floor heating pipeline is arranged on the guiding heat-insulating plate, the fixing piece is arranged in the carding channel, a buckle for fixing the floor heating pipeline is arranged on the fixing piece, and a closed loop space for fixing the floor heating pipeline is formed by the buckle and the raised side wall.

6. The floor mounting structure at a water collector of claim 1, wherein a plurality of circular bosses are arranged at intervals on the mounting insulation board, and the circular bosses are arranged in a rectangular array at equal intervals.

7. The floor mounting structure at the water collector position according to claim 6, wherein a steel wire mesh for fixing a floor heating pipeline is arranged on the mounting insulation board, and a clamping groove for placing the steel wire mesh is arranged on the circular boss.

8. The sump floor mounting structure of claim 1, wherein the support member comprises:

the base is provided with a first plane used for being placed on the ground;

the guide sleeve is fixedly connected with the base and is perpendicular to the first plane; one end of the guide sleeve, which is far away from the base, is provided with a threaded hole which is coaxial with the inner hole of the guide sleeve;

one end of the screw rod is in threaded fit with the threaded hole;

the other end of the screw is rotatably arranged on the supporting part, and a second plane parallel to the first plane is arranged on one side, far away from the base, of the supporting part.

9. The structure of claim 8, wherein a positioning chuck is detachably disposed on the supporting portion, the positioning chuck is disposed on the second plane, and a positioning boss for positioning the position of the carrier plate is disposed on the positioning chuck.

10. The structure of claim 9, wherein the positioning chuck is provided with a relief hole for rotating the screw.

Background

At present, floor heating is widely adopted in China, particularly floor heating is almost completely adopted for heating of newly-built buildings, the floor heating has the advantages of being blocked at all times, particularly, pipelines and heating radiators which are arranged in the room are removed in the room, the use space of the room decoration is increased conveniently, and the living environment is more attractive and energy-saving. The floor heating pipeline is connected with the water outlet of the water collector through the water inlet, and the water return port of the floor heating pipeline is connected with the water inlet of the water collector. But among the prior art because the inlet tube and the wet return of warm up the pipeline all are located water collector department, lead to the pipeline quantity of water collector department too much, consequently need comb fixedly through the manual work to warm up the pipeline of water collector department in the construction laying process, just can prevent that the pipeline from taking place to fold firmly, lead to the complicated pipeline of pipeline installation operation process to arrange inconveniently.

Disclosure of Invention

The invention aims to provide a floor mounting structure at a water collector, and aims to solve the problem that in the prior art, a heating pipeline below the water collector is complex in arrangement operation and inconvenient in arrangement in the floor heating construction process.

In order to achieve the purpose, the invention adopts the technical scheme that: there is provided a sump floor mounting structure, including:

the guide heat-insulation plate is arranged below the water collector connecting port, a groove for mounting a floor heating pipeline is formed in the guide heat-insulation plate, a plurality of adjacent protrusions which are arranged at intervals are arranged in the groove, and a combing channel for combing the floor heating pipeline is formed by the plurality of protrusions;

the guide heat-insulation board is provided with a groove for mounting a floor heating pipeline, and the bottom of the groove is provided with a plurality of carding channels for accommodating and clamping the floor heating pipeline;

a plurality of installation insulation boards are arranged, are arranged around the guide insulation board in a surrounding manner, and are provided with installation grooves communicated with the carding channel and used for clamping a floor heating pipeline;

the bearing plate is arranged below the guide heat-insulation plate and the installation heat-insulation plate, and is provided with an installation position for installing the guide heat-insulation plate and the installation heat-insulation plate;

and the supporting piece is arranged below the bearing plate and used for supporting the bearing plate to be fixed on the ground.

As another embodiment of the application, the carding channel is composed of a plurality of adjacently arranged bulges, the carding channel is arranged along a straight line in the length direction and is adjacent to the bulges, and the bulges are arranged along the length direction of the carding channel in a staggered manner.

As another embodiment of this application, the exit of combing the passageway is provided with a plurality of guide posts, and two are adjacent be provided with the clearance that is used for the floor heating pipeline to pass through between the guide post.

As another embodiment of this application, it is provided with the inclined plane to lie in water collector connector below in the recess, the inclined plane sets up to the extension of recess bottom along ground heating pipeline direction of delivery.

As another embodiment of this application, be provided with the mounting that is used for fixed ground heating pipeline on the direction heated board, the mounting sets up in the carding channel, be provided with the buckle that is used for fixed ground heating pipeline on the mounting, the buckle with bellied lateral wall is constituteed and is used for the closed loop space of fixed ground heating pipeline.

As another embodiment of this application, be provided with the circular boss that a plurality of intervals set up on the installation heated board, it is a plurality of circular boss is rectangular array and equidistant setting.

As another embodiment of this application, be provided with the wire net that is used for fixed ground heating pipeline on the installation heated board, be provided with the mounting groove that is used for placing the wire net on the circular boss.

As another embodiment of the present application, the support member includes:

the base is provided with a first plane used for being placed on the ground;

the guide sleeve is fixedly connected with the base and is perpendicular to the first plane; one end of the guide sleeve, which is far away from the base, is provided with a threaded hole which is coaxial with the inner hole of the guide sleeve;

one end of the screw rod is in threaded fit with the threaded hole;

the other end of the screw is rotatably arranged on the supporting part, and a second plane parallel to the first plane is arranged on one side, far away from the base, of the supporting part.

As another embodiment of this application, can dismantle on the supporting part and be provided with location chuck, location chuck sets up on the second plane, be provided with the location boss that is used for fixing a position the carrier plate position on the location chuck.

As another embodiment of this application, be provided with on the location chuck with be used for rotating the hole of stepping down of screw rod.

The floor mounting structure at the water collector provided by the invention has the beneficial effects that: compared with the prior art, through being provided with the direction heated board in the below of water collector, be provided with the recess that is used for installing the pipeline of heating up on the direction heated board, inlet tube and wet return on the pipeline of heating up all are located the direction heated board, through being connected with the direction heated board after and with water collector communicating pipe, be provided with the carding passageway that a plurality of intervals set up in the recess of direction heated board, carding passageway is used for holding and clamps the pipeline of heating up, enclose outside the direction heated board and be equipped with the installation heated board, installation heated board and direction heated board all set up on the loading board, the loading board passes through support piece's support to be fixed subaerial, be provided with the mounting groove on the installation heated board, the mounting groove communicates with carding passageway, can place the pipeline of heating up in carding passageway when laying, and clamp the fixing to the pipeline of heating up through carding passageway, make a plurality of pipeline of heating up effective, the pipeline of heating up, Neat arranging is on the direction heated board to extend to the installation heated board through the mounting groove on, lay the ground heating pipeline. Can reduce the arrangement to the pipeline in the installation, the workman can arrange the installation in order to a plurality of ground heating pipe ways through combing passageway and mounting groove, reduces the installation step, easy operation, ground heating pipe way arranges the convenience.

Drawings

In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed for the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.

Fig. 1 is a schematic structural view of a floor mounting structure at a sump according to an embodiment of the present invention;

FIG. 2 is a side cross-sectional view of FIG. 1;

FIG. 3 is a schematic structural diagram of a supporting member according to an embodiment of the present invention;

FIG. 4 is a top view of FIG. 3;

FIG. 5 is a schematic cross-sectional view of a fastener provided in accordance with an embodiment of the present invention;

fig. 6 is a schematic structural view of a floor mounting structure at a sump according to another embodiment of the present invention.

In the figure: 1. guiding the insulation board; 11. a groove; 12. a protrusion; 13. a carding channel; 14. a guide post; 15. an inclined surface; 2. installing an insulation board; 21. mounting grooves; 22. a circular boss; 221. clamping grooves; 3. a carrier plate; 4. a support member; 41. a base; 42. a guide sleeve; 43. a screw; 44. a support portion; 45. positioning the chuck; 451. positioning the boss; 5. a panel layer; 6. a fixing member; 61. buckling; 7. steel wire mesh; 8. ground heating pipeline.

Detailed Description

In order to make the technical problems, technical solutions and advantageous effects to be solved by the present invention more clearly apparent, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.

Referring to fig. 1 and 2 together, a floor installation structure at a sump according to the present invention will now be described. The floor mounting structure at the water collector comprises a guide heat insulation plate 1, a mounting heat insulation plate 2, a bearing plate 3 and a support piece 4. The guide heat-insulation board 1 is provided with a groove 11 for mounting the floor heating pipeline 8, and the bottom of the groove 11 is provided with a plurality of carding channels 13 for accommodating and clamping the floor heating pipeline 8; the installation heat preservation plates 2 are multiple in number, the installation heat preservation plates 2 are arranged around the guide heat preservation plate 1 in a surrounding mode, and installation grooves 21 which are communicated with the carding channel 13 and used for clamping the floor heating pipelines 8 are formed in the installation heat preservation plates 2; the bearing plate 3 is arranged below the guide heat-insulation plate 1 and the installation heat-insulation plate 2, and the bearing plate 3 is provided with installation positions for installing the guide heat-insulation plate 1 and the installation heat-insulation plate 2; the supporting member 4 is disposed under the loading plate 3 for supporting the loading plate 3 to be fixed on the ground.

Compared with the prior art, the floor installation structure at the position of the water collector is characterized in that the guide heat-insulation board 1 is arranged below the water collector, the groove 11 for installing the floor heating pipeline 8 is formed in the guide heat-insulation board 1, the water inlet pipe and the water return pipe on the floor heating pipeline 8 are both positioned on the guide heat-insulation board 1, the guide heat-insulation board 1 is connected with the guide heat-insulation board 1 and then communicated with the water collector, a plurality of carding channels 13 arranged at intervals are arranged in the groove 11 of the guide heat-insulation board 1, the carding channels 13 are used for accommodating and clamping the floor heating pipeline 8, the installation heat-insulation board 2 is arranged around the outer side of the guide heat-insulation board 1, the installation heat-insulation board 2 and the guide heat-insulation board 1 are both arranged on the bearing board 3, the bearing board 3 is fixed on the ground through the support of the support piece 4, the installation heat-insulation board 2 is provided with the installation groove 21 which is communicated with the carding channels 13, the floor heating pipeline 8 can be placed in the carding channels 13 during laying, and clamp fixedly to ground heating pipe 8 through carding channel 13, make a plurality of ground heating pipe 8 effective, neat arrange on direction heated board 1 to extend to installation heated board 2 through mounting groove 21 on, lay ground heating pipe 8. Can reduce the arrangement to the pipeline in the installation, the workman can arrange the installation in order to a plurality of ground heating pipeline 8 through combing passageway 13 and mounting groove 21, reduces the installation procedure, easy operation, ground heating pipeline 8 arranges the convenience.

In this embodiment, loading board 3 goes up the concave installation position that is used for installing direction heated board 1 and installation heated board 2 that is equipped with, direction heated board 1 all with installation heated board 2 through installation position fixed mounting on installation position, loading board 3 outwards extends a plurality of stands, the installation position that is used for spacing direction heated board 1 and bears the weight of heated board is constituteed to a plurality of stands, direction heated board 1 all blocks between the stand with installation heated board 2 and sets up with the stand laminating, can reduce the whole weight of loading board 3, can increase the area of direction heated board 1 and installation heated board 2 simultaneously, improve the heat preservation effect, be fixed with panel layer 5 in the top of stand, make panel layer 5 can obtain the support of loading board 3.

In this embodiment, the upper surface of direction heated board 1 and the upper surface of installation heated board 2 and the upper surface of loading board 3 upper column all are located the coplanar, make things convenient for the installation of making level of panel layer 5 and improve the supporting capacity of overall installation structure to panel layer 5.

In this embodiment, panel layer 5 includes screed-plate and floor, and the screed-plate setting is in direction heated board 1 and installation heated board 2 tops, and the floor is installed in the top of screed-plate, constitutes floor mounting structure.

Referring to fig. 1 and 2 together, a combing channel 13 is composed of a plurality of protrusions 12 arranged adjacently, the combing channel 13 is arranged linearly along the length direction, and two adjacent protrusions 12 are arranged in a staggered manner along the length direction of the combing channel 13. A plurality of carding channels 13 are parallel to each other or extend to the outside heated board 2 of installing all around of contained angle and set up, carding channel 13 length direction sets up along the straight line and can reduce the number of times of buckling of warm up pipeline 8 in laying process, reduces warm up pipeline 8 and takes place the risk of dead book. Two adjacent bulges 12 are arranged along the length direction of the carding channel 13 in a staggered manner, so that the floor heating pipeline 8 can be conveniently installed, the situation that when the gap between the two bulges 12 is smaller than the outer diameter of the floor heating pipeline 8 can be avoided, the floor heating pipeline 8 is difficult to install or is extruded by the side walls of the bulges 12 to cause the deformation of the floor heating pipeline 8, and meanwhile, the production material of the guide mounting plate can be saved.

In this embodiment, the protrusion 12 is a rectangular structure, and the side of the protrusion 12 is parallel to the carding channel 13, and the two adjacent sides of the protrusion 12 are rounded. The lateral wall setting of the protruding 12 of the outside laminating of ground heating pipe way 8 can make ground heating pipe way 8 more be the straight setting in carding channel 13, and the top of protruding 12 and the top of loading board 3 are on the coplanar, can play certain supporting role to panel layer 5.

As a specific embodiment of the floor mounting structure at the water collector provided by the present invention, please refer to fig. 1 and fig. 2, a plurality of guide pillars 14 are provided at the outlet of the carding channel 13, and a gap for the floor heating pipeline 8 to pass through is provided between two adjacent guide pillars 14. The outside of guide post 14 is provided with the fillet that prevents that floor heating pipe way 8 from taking place to die, guide post 14 is cylindrical structure, and the external diameter of guide post 14 is greater than the external diameter of floor heating pipe way 8, floor heating pipe way 8 changes the direction of delivery through guide post 14 to installation heated board 2 departments, can prevent through guide post 14 that floor heating pipe way 8 from taking place to die when carrying to installation heated board 2 directions, can reduce the pipeline carding of pipeline 8 of heating pipe way artificially simultaneously, conveniently warm up the installation of management, improve floor heating pipe way 8's installation effectiveness.

As a specific embodiment of the floor mounting structure at the water collector provided by the present invention, please refer to fig. 1 and fig. 2, an inclined plane 15 is disposed in the groove 11 below the water collector connection port, and the inclined plane 15 extends toward the bottom of the groove 11 along the conveying direction of the floor heating pipe 8. Inclined plane 15 sets up the bottom at recess 11, by the lateral wall of recess 11 to the export orientation downward sloping setting of carding passageway 13, inclined plane 15 is located the below of water collector connector, warm up pipeline 8 and water collector intercommunication extend to the recess 11 of below in to, take place to buckle and extend to carding passageway 13 behind the inclined plane 15 of recess 11 bottom, the angle of buckling that can make warm up pipeline 8 through setting up of inclined plane 15 keeps the obtuse angle state, prevent that warm up pipeline 8 from taking place to die, the circulation that pipeline 8 was warmed up in the influence.

As a specific embodiment of the floor mounting structure at the water collector provided by the invention, please refer to fig. 1, fig. 2 and fig. 5, a fixing member 6 for fixing the floor heating pipeline 8 is arranged on the guiding insulation board 1, the fixing member 6 is arranged in the carding channel 13, a buckle 61 for fixing the floor heating pipeline 8 is arranged on the fixing member 6, and the buckle 61 and the side wall of the protrusion 12 form a closed loop space for fixing the floor heating pipeline 8. The fixing piece 6 is arranged in the carding channel 13, the bottom plate of the fixing piece 6 is placed on the guide heat insulation plate 1, the mounting surface of the bottom plate is of an arc-shaped structure matched with the outer diameter of the floor heating pipeline 8, the floor heating pipeline 8 is convenient to mount and fix on the fixing piece 6, and the floor heating pipeline 8 can be guaranteed to be kept in a linear state, the fixing piece 6 is provided with a buckle 61, the buckle 61 is of an arc-shaped structure, the opening of the buckle 61 is located on one side of the buckle 61 and on one side of the buckle 61 close to the bulge 12, the fixing piece 6 can move in the carding channel 13 along the length direction of the carding channel 13, when the fixing piece is used, the floor heating pipeline 8 can be placed inside the buckle 61 through the opening on the buckle 61, the fixing piece 6 is placed inside the carding channel 13, the fixing piece 6 moves in the length direction of the carding channel 13, and the side wall of the bulge 12 blocks the opening of the buckle 61, so that the floor heating pipeline 8 cannot move out of the buckle 61, convenient operation, and can with the ground heating pipeline 8 stable fix in carding channel 13.

In this embodiment, the fixing member 6 is provided with a plurality of fasteners 61, the openings of the fasteners 61 respectively extend beyond the protrusions 12 on both sides of the carding channel 13, and the fixing member 6 is provided with a fixing portion extending outward from one side of the bottom plate, and the fixing portion of the fixing member 6 is provided with a mounting hole for fixing the fixing member 6 on the guide insulation board 1 by passing a screw through the mounting hole when the opening of the fastener 61 coincides with the sidewall of the protrusion 12 when the fixing member 6 is moved. Convenient operation improves the stability of ground heating pipeline 8 installation.

As a specific embodiment of the floor installation structure at the water collector provided by the present invention, please refer to fig. 1, a plurality of circular bosses 22 are arranged at intervals on the installation insulation board 2, and the plurality of circular bosses 22 are arranged in a rectangular array and at equal intervals. Constitute between two adjacent circular bosss 22 and be used for installing the mounting groove 21 of warming up pipeline 8, and circular boss 22 can conveniently warm up the change of the direction of laying of pipeline 8 for cylindrical setting, and warm up pipeline 8 and can buckle along cylindrical appearance, and the pipeline 8 transition that makes warms up is more smooth-going. A plurality of circular bosss 22 are the rectangle and display and arrange and can guarantee that the interval between two bosss equals, can calculate the length of heating up pipeline 8 through the quantity of circular boss 22 with reference to heating up pipeline 8, reduce and lay the measurement of length to heating up pipeline 8 in laying process. Thereby be convenient for judge the length of laying of ground heating pipeline 8 according to the quantity of passing circular boss 22 on installation heated board 2 according to the operating mode demand and set up the inflection point on the ground heating pipeline 8.

As a specific embodiment of the floor mounting structure at the water collector provided by the invention, please refer to fig. 1, a steel wire mesh 7 for fixing a floor heating pipeline 8 is arranged on a mounting insulation board 2, and a clamping groove 221 for placing the steel wire mesh 7 is arranged on a circular boss 22. Wire net 7 is laid on installation heated board 2, through be provided with wire net 7 on circular boss 22, clamp groove 221 cross setting on circular boss 22 and the intersect is located the axis of circular boss 22, the bottom surface that clamps groove 221 is less than the installation face setting of ground heating pipeline 8 on installation heated board 2, make the installation of wire net 7 not influence laying of ground heating pipeline 8, wire net 7 can realize the location to wire net 7 through placing to clamping in the groove 221, the steel wire on the wire net 7 is located and clamps the groove 221, through using self-locking type nylon ribbon with ground heating pipeline 8 and wire net 7 fixed connection, high durability and convenient operation, the installation is simple.

Referring to fig. 2, 3 and 4 together, as an embodiment of the installation structure of the floor at the water collector provided by the present invention, the supporting member 4 includes a base 41, a guiding sleeve 42, a screw 43 and a supporting portion 44. The base 41 is provided with a first plane for placing on the ground; the guide sleeve 42 is fixedly connected with the base 41 and is arranged perpendicular to the first plane; one end of the guide sleeve 42, which is far away from the base 41, is provided with a threaded hole which is coaxially arranged with an inner hole of the guide sleeve 42; one end of the screw 43 is in threaded fit with the threaded hole; the other end of the screw 43 is rotatably disposed on the support portion 44, and a second plane parallel to the first plane is disposed on a side of the support portion 44 away from the base 41. Guide sleeve 42 passes through welded fastening on base 41, screw rod 43 can be at the inside slip of guide sleeve 42, the one end of keeping away from base 41 at guide sleeve 42 is provided with mounting groove 21, the mounting groove 21 internal fixation is provided with the nut, the bottom of nut is contradicted in the bottom of mounting groove 21, mounting groove 21 be with nut outside assorted hexagon structure, the nut passes through welded fastening in mounting groove 21 simultaneously, screw rod 43 one end and nut threaded connection, the other end rotates and sets up on supporting part 44, be provided with on screw rod 43 and be used for preventing supporting part 44 along the joint groove of screw rod 43 axis direction removal, supporting part 44 joint is in the joint inslot, can internal rotation adjust the interval between supporting part 44 and the base 41 at guide sleeve 42 through drive screw rod 43.

In this embodiment, the screw 43 runs through the setting of supporting part 44, and the top of screw 43 is provided with the regulation hole that is used for rotating screw 43, is provided with the hole of stepping down that is used for dodging regulation hole on the screw 43 on the loading board 3, can adjust simple operation, simple to operate to support piece 4's height after placing support piece 4 with loading board 3.

Referring to fig. 2 and 3 together, as a specific embodiment of the floor mounting structure at the water collector provided by the present invention, a positioning chuck 45 is detachably disposed on the supporting portion 44, the positioning chuck 45 is disposed on the second plane, and a positioning boss 451 for positioning the position of the bearing plate 3 is disposed on the positioning chuck 45. Be provided with the mounting hole on the supporting part 44, the bottom of location chuck 45 is provided with the screw hole that corresponds with it, can dismantle the connection on supporting part 44 through location chuck 45, can be different according to loading board 3 mounted position and specification, changes the location chuck 45 of corresponding shape and specification, the maneuverability of reinforcing loading board 3 installation.

Referring to fig. 3 and 4 together, as a specific embodiment of the installation structure of the floor at the water collector provided by the present invention, the positioning chuck 45 is provided with an abdicating hole for rotating the screw 43. The positioning chuck 45 is provided with a yielding hole for rotating the screw 43, and the bearing plate 3 is also provided with a corresponding yielding hole, so that the height of the bearing plate 3 can be conveniently adjusted.

In this embodiment, the supporting members 4 are disposed at four corners of the bearing plate 3, one supporting member 4 can simultaneously support four bearing plates 3, and the corners of the vehicle bearing plate are provided with abdications for rotating the screw 43, so that the flatness of the bearing plate 3 can be adjusted after the bearing plate 3 is mounted.

As a specific embodiment of the floor mounting structure at the water collector provided by the invention, please refer to fig. 6, the protrusion 12 is arranged inside the groove 11 along the length direction of the guide insulation board 1, the floor heating pipeline 8 is arranged along the length direction of the guide insulation board 1, and the length direction of the protrusion 12 extends from the water collector connection port to the guide post 14, so that the overall strength of the protrusion 12 can be enhanced, and the protrusion 12 is prevented from being broken when the floor heating pipeline 8 is mounted. And protruding 12 is provided with the fillet keeping away from water collector connector one end, takes place to fold when preventing that warm up pipeline 8 from buckling, and protruding 12 is provided with the spacing portion that is used for clamping warm up pipeline 8 far away from recess 11 bottom one side, and spacing portion constitutes the crooked draw-in groove that is used for clamping warm up pipeline 8 with protruding 12 lateral walls, and warm up pipeline 8 and fix in crooked draw-in groove, and easy to assemble can effectively play dredging and fixed effect to warm up pipeline 8 in water collector department.

The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

完整详细技术资料下载
上一篇:石墨接头机器人自动装卡簧、装栓机
下一篇:一种EPS线条及其生产工艺

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!